Thursday, September 10, 2009

Pre-launch Marathon

So, I had given myself a goal of getting the XCR in the water on Labor Day... that didn't quite happen, but not because it wasn't ready to go. Anyway, I have a few days worth of work to report on. I narrowed the tasks down to the minimum necessary to get the boat into the water: getting the trailer finished and roadworthy, installing the seats, and installing the carrying handles.

First the handles. What should have been simple turned into quite a struggle. I found a place that looked good, then drilled holes for the mounting screws through the deck and backing block. I was using machine screws, so I needed to put the nuts and washers on the inside to hold everything together. Since the handles are near the front (and back) of the boat, the nuts and washers are inside the closed off area behind the bulkhead. I had installed a hatch, so I should be able to just reach in there and spin on the nuts right? Wrong. First of all, I peak in there and don't see my bolts... hmm... I figure out that they are not long enough, so off to Menards for some new ones. Back from Menards with new bolts that are plenty long, so I check the fit with the mating nuts. I find out that I ended up with course thread bolts and fine thread nuts. Arrrggghhh!! Off to Meijer this time (Menards in closed by now...) to get the right size nuts. Back home, checked everything again, and it all fits, good. So now to just reach in a thread them on... not quite so easy! I had to squish myself into the narrow front of the boat, and reach through the small hatch all the way to the very front and thread those nuts on blind. After much stretching, wriggling, and sweating, I finally got them on and tightened down. Whew!!



The seats were a lot easier to get installed. I first made 8 aluminum "L" brackets that the seats hang from. Here is one without the holes drilled:


These were mounted to the seats using some more stainless steel machine screws where this time, everything fit the first time! I then used some larger diameter bolts to attach the "L's" to the previously installed seat brackets:



Finally, the trailer... First I put the plywood bedding on. Then I built "bunks" starting with the 2x6's I had previously cut to match the bottom profile of the boat. A couple notches were cut into this part for the U-bolts that held the bunks to the bed of the trailer. Then, I glued and screwed a 1x4 to the top, glued a piece of camping pad to that, and wrapped the whole thing in trailer bunk carpet.





No comments:

Post a Comment